Submitted to TAC Mail List: 2024-11-19? TBD
Presented on TAC Weekly Call: TBD 2024-11-20 (Meeting Recording TBD)
...
Info |
---|
Below is a self-assessment submitted by TSC Chair/Maintainers of the Project. Comments/questions/feedback is welcome either a) in the Comments at the bottom of the page or b) during the TAC call when information is presented |
...
Stage 2 Criteria (from the PLD) | Meets / Needs Improvement / Missing / Not Applicable | Supporting Data (if needed, include links to specific examples) |
---|---|---|
Development of a growth plan (to include both roadmap of projected feature sets as well as overall community growth/project maturity), to be done in conjunction with their project mentor(s) at the TAC. | Meets | The project creates a build every two weeks (for every sprint) and an LTS release twice a year. |
Document that it is being used in POCs. | Meets | Project EVE has been used in various POCs and is in large-scale production use. See https://github.com/lf-edge/eve/blob/master/ADOPTERS.md |
Demonstrate a substantial ongoing flow of commits and merged contributions. | Meets | Over the last 12 months we have had 1059 commits from 57 contributors across 10 repositories Note that in Sept 2023 we introduced the eve-kernel repository which is a clone of the Linux kernel with ots complete git history. LFX Insights picks that up, and as a result the total contributors are 25,000! One can look at less confusing data individually for the other repositories e.g., the main EVE repo. |
Demonstrate that the current level of community participation is sufficient to meet the goals outlined in the growth plan. | Meets | The above level of commits are likely to continue as we continue deliver the items on the roadmap and grow the TSC and committers. |
Demonstrate evidence of, or a plan for, interoperability, compatibility or extension to other LF Edge Projects. Examples may include demonstrating modularity (ability to swap in components between projects). | Meets | Worked with FDO and OpenHorizon to demo a combined EVE, FDO, and OpenHorizon at One Summit 2024 in San Jose. In addition work with other LF projects like CNCF SPOS WG and Margo. Previous worked closely with EdgeX Foundry and Akraino. Plus separate work to enable the LF Edge Sandbox where EVE is a foundation for deploying different LF Edge projects and other software on edge devices. Note that “interoperability” in most of the above cases means that EVE is used as a substrate to deploy and operate these other LF Edge projects. The exception is the FDO integration which involved modifications to EVE. |
...